Date:
October 2021
Job Specifics:
Full engineer designed and specified shrink wrap encapsulation, for demolition of asbestos building as required.
Trusses to span over site and tiedowns for wind and the elements.
Mono pitch slope for rain run off as required.
Due to lack of propping below, made for challenging installation at height with Knuckleboom.
Job WELL DONE by the Diamond Scaffolding Team!!!